Planning plasterwork for a new kitchen
Installations, wall finishes and kitchen mounting must be connected together. Prefix pipes, spray zones and dimensions.
On this page
The answer to your situation
Installations, wall finishes and kitchen mounting must be connected together. Prefix pipes, spray zones and dimensions.
See the finish in detail.
What should you check first?
Discuss with the kitchen supplier and installer what work needs to be done. New power outlets and pipe slots usually belong in the planning before the final completion. Save images of pipeline routes and indicate which walls remain visible.
How does this affect your choice?
The area behind the worktop may need a different finish than the rest of the kitchen. Choose the construction based on use and load. A decorative appearance alone does not say enough about cleaning, splash water and maintenance. Ask for the chosen system and the conditions of application.
Planning the next step
Coordinate the connections to cabinets, worktop and window frames. An extra stucco layer can influence the measurement. Pass on the installation planning, but lets the time of finishing and further processing also depend on the substrate and drying. Thus, the planning remains feasible.
Practical checklist
- Share the kitchen plan
- Allow installations to complete
- Choose the splash zone finish
- Check measurement
| In your request | What this tells us |
|---|---|
| Overview photo of the space | Where the work comes and what connections there are. |
| Detail of the substrate | Structure, damage, old layers and specific points. |
| Approximate dimensions and desired finish | Which areas are treated and how they are finished. |
Questions about this topic
When does plaster work fit into kitchen mounting?
Installations, wall finishes and kitchen mounting must be connected together. Prefix pipes, spray zones and dimensions.
Which agreements help to implement the agreement?
Coordinate the connections to cabinets, worktop and window frames. An extra stucco layer can influence the measurement. Pass on the installation planning, but lets the time of finishing and further processing also depend on the substrate and drying. Thus, the planning remains feasible.
More advice for your project
Confirm fittings and connection points first
A kitchen wall can be damaged again when electrical sockets, water points or drains have to shift after plastering. Therefore, tune the kitchen lining and installations first. Also indicate where closets, back walls and visible parts come in.
Discuss these points for your home
- Use the current kitchen drawing.
- Capture which parts remain visible.
- Plan a check after pipework and before finishing.
Discuss your plastering project.
Send your wishes, images and estimated dimensions. We will check which preparation and finishing suits your home.