Blog · Spaces

Planning plasterwork for a new kitchen

Installations, wall finishes and kitchen mounting must be connected together. Prefix pipes, spray zones and dimensions.

A light strip falls along a light wall.

The answer to your situation

Quick answer

Installations, wall finishes and kitchen mounting must be connected together. Prefix pipes, spray zones and dimensions.

Finishes in detail

See the finish in detail.

Interior inspirationA light entrance with quiet walls.
Interior inspirationA living interior with natural light on the wall.

What should you check first?

Discuss with the kitchen supplier and installer what work needs to be done. New power outlets and pipe slots usually belong in the planning before the final completion. Save images of pipeline routes and indicate which walls remain visible.

How does this affect your choice?

The area behind the worktop may need a different finish than the rest of the kitchen. Choose the construction based on use and load. A decorative appearance alone does not say enough about cleaning, splash water and maintenance. Ask for the chosen system and the conditions of application.

Planning the next step

Coordinate the connections to cabinets, worktop and window frames. An extra stucco layer can influence the measurement. Pass on the installation planning, but lets the time of finishing and further processing also depend on the substrate and drying. Thus, the planning remains feasible.

Practical checklist

  • Share the kitchen plan
  • Allow installations to complete
  • Choose the splash zone finish
  • Check measurement
In your requestWhat this tells us
Overview photo of the spaceWhere the work comes and what connections there are.
Detail of the substrateStructure, damage, old layers and specific points.
Approximate dimensions and desired finishWhich areas are treated and how they are finished.

Questions about this topic

When does plaster work fit into kitchen mounting?

Installations, wall finishes and kitchen mounting must be connected together. Prefix pipes, spray zones and dimensions.

Which agreements help to implement the agreement?

Coordinate the connections to cabinets, worktop and window frames. An extra stucco layer can influence the measurement. Pass on the installation planning, but lets the time of finishing and further processing also depend on the substrate and drying. Thus, the planning remains feasible.

Confirm fittings and connection points first

A kitchen wall can be damaged again when electrical sockets, water points or drains have to shift after plastering. Therefore, tune the kitchen lining and installations first. Also indicate where closets, back walls and visible parts come in.

Discuss these points for your home

  • Use the current kitchen drawing.
  • Capture which parts remain visible.
  • Plan a check after pipework and before finishing.
From planning to completion

Discuss your plastering project.

Send your wishes, images and estimated dimensions. We will check which preparation and finishing suits your home.

Request a free quote