Planning plastering during a renovation

The best order of work combines demolition, installations, substrate, plastering and finishing. Tune those steps before a execution date is fixed.

A rough-painted patch surface.

The answer to your situation

Quick answer

The best order of work combines demolition, installations, substrate, plastering and finishing. Tune those steps before a execution date is fixed.

Finishes in detail

See the finish in detail.

Interior inspirationA light entrance with quiet walls.
Interior inspirationA living interior with natural light on the wall.

What should you check first?

Make an overview of work that changes the walls or ceilings. New pipes, sheetwork and framework can cause repair if they are carried out too late. Therefore, let the parties involved coordinate their parts and interfaces.

How does this affect your choice?

Check working conditions and protection. A new floor, kitchen or stairs can affect accessibility and pasting. Also indicate where material can be supplied and which spaces should remain usable at the same time.

Planning the next step

After plastering, plan time for drying and assessment. Painting and wallpaper only follow when the substrate is suitable. Keep a list of open points and tune changes in planning immediately. A joint overview prevents unnecessary return and damage to new work.

Practical checklist

  • Create one work order
  • Discuss interfaces
  • Protection Rule
  • Plan drying control
In your requestWhat this tells us
Overview photo of the spaceWhere the work comes and what connections there are.
Detail of the substrateStructure, damage, old layers and specific points.
Approximate dimensions and desired finishWhich areas are treated and how they are finished.

Questions about this topic

How does plaster work fit in the order of a renovation?

The best order of work combines demolition, installations, substrate, plastering and finishing. Tune those steps before a execution date is fixed.

Which agreements help to implement the agreement?

After plastering, plan time for drying and assessment. Painting and wallpaper only follow when the substrate is suitable. Keep a list of open points and tune changes in planning immediately. A joint overview prevents unnecessary return and damage to new work.

Use checkpoints between performers

Smooth planning not only consists of consecutive dates. Also plan when pipework is checked, the space is ready for plastering and the substrate is accepted for paint. This way deviations can be solved before they hit the next work.

Discuss these points for your home

  • Pre-tuning installations and measurement.
  • Reserve time for drying according to actual condition.
  • Record who sends changes to the schedule.
From planning to completion